San Diego County Regional Watershed Management Area Analysis
Jurisdiction Specific Materials : JRMP , Jurisdictions : County of San Diego
On May 8, 2013, the California Regional Water Quality Control Board, San Diego Region adopted Order No. R9-2013-0001; NPDES No. CAS 0109266, National Pollutant Discharge
Elimination System (NPDES) Permit and Waste Discharge Requirements for Discharges from the Municipal Separate Storm Sewer Systems (MS4s) Draining the Watersheds within the San
Diego Region (Regional MS4 Permit). The Regional MS4 Permit, which became effective on June 27, 2013, replaces the previous MS4 Permits that covered portions of the Counties of San
Diego, Orange, and Riverside within the San Diego Region. There were two main goals for the Regional MS4 Permit:
- To have more consistent implementation, as well as improve inter-agency communication (particularly in the case of watersheds that cross jurisdictional
boundaries), and minimize resources spent on the permit renewal process. - To establish requirements that focused on the achievement of water quality improvement goals and outcomes rather than completing specific actions, thereby giving the Copermittees more control over how their water quality programs are implemented.
To achieve the second goal, the Regional MS4 Permit requires that Water Quality Improvement Plans (WQIPs) be developed for each Watershed Management Area (WMA) within the San
Diego Region. As part of the development of WQIPs, the Regional MS4 Permit provides Copermittees an option to perform a Watershed Management Area Analysis (WMAA) through
which watershed-specific requirements for structural BMP implementation for Priority Development Projects can be developed for each WMA. This report presents the Copermittees’
approach and results for the regional elements of the WMAA developed for the San Diego County area.